Published July 28, 2009
HOW IT WORKS
Glad You Asked features questions from Facts readers. Facts staff members pose those questions to local newsmakers who provide the answers.
POSE A QUESTION
Have a question for Glad You Asked? E-mail it to news(at)thefacts.com, fax it to (979) 265-9052 or drop it off at our offices in Clute or Angleton.
QUESTION: New electrical poles are being installed on the west side of Highway 332 from Randalls to Flag Ridge. There were no existing poles in this area. What existing electrical service in the area will these new poles replace?
ANSWER: Due to the overpasses being installed and the subsequent changes to the ground elevations required by the Texas Department of Transportation’s road development program, a number of existing power line crossings could not be maintained in their current locations.
CenterPoint Energy’s Distribution Planning Department conducted a study of the existing power lines and developed a plan to reconfigure the lines so that crossings could be made at locations where TxDOT’s final grade of the land would allow us to cross.
— Alice Dixon, Electric, Natural Gas, Pipelines and Field Services operations, CenterPoint Energy